Relocation of Power Plant Maintenance Workshop
The Third Prize
  Project:
Relocation of Power Plant Maintenance Workshop and New construction of Training & Activity Center in Linkou(Competition)
  Building Type:
Public
  Year:
2009
  Area:
Northern Taiwan
  Phase:
Planning and Design
  Location:
Linkou, Taoyuan, Taiwan, R.O.C.
  Client:
Taiwan Power Company
  Major Use:
Offices∕Maintenance Shop∕ Activity Center / Dormitory & Restaurant Hall
  Size:

Site area/97,600 ㎡
Building area/27,575 ㎡
Total Floor area/74,215 ㎡
10 buildings. The highest is「Administration and Blade Regeneration Plant Main Building」(11F).
The others are about 2-6 stories.

  Construction Cost:
NT$ 3 ,691,105,180- 
  Structure System:
Maintenance and Training Workshop:Steel structure
Office /Dormitory:RC structure
  Materials:
1. Green Envelope:
     Roof: Solar Panels and Green Roof
     Elevation: Plant Walls
2. Green Building Materials:
    Use of fly ash in concrete output by Taipower Company's related plants.
    Use of ecological, health, high performance, green building recycled materials.
  Design Features:
1. Propose sustainable living aesthetics to visualize environmental protection ideas of Taiwan Power Company.
2.Design a Green Ecological Demonstration Base, following sustainable strategies of Taiwan Power Company  such as energy saving and carbon reduction.
3. Meet the functional needs, and restore the original ecosystem.
4. Restore green areas of the new construction by increasing green walls and green roof.
5. The design is qualified for both EEWH Gold certification and LEED Gold certification
  Awards:
The Third Prize
  Design Period:
2009/06~2010/01
 
 